| Kangakipur Ecd |
Complete
|
2014/2015 |
Turkana South |
Kalapata |
| Abc |
Stalled
|
2020/2021 |
Turkana North |
Kaeris |
| Abuse Ecde |
Stalled
|
2015/2016 |
Turkana West |
Letea |
| Akoros Loritit Ecde |
Complete
|
2013/2014 |
Turkana West |
Letea |
| Akwangat Borehole |
Complete
|
2015/2016 |
Turkana West |
Kakuma |
| Akwangat Ecde |
Complete
|
2015/2016 |
Turkana West |
Kakuma |
| Amani ECD |
Complete
|
2013/2014 |
Aroo |
Katilu |
| Atapokong |
Complete
|
2023/2024 |
Turkana South |
Lokichar |
| Completion of Kaemothia ECDE |
Not Started
|
2023/2024 |
Kibish |
Kibish |
| Construction and equipping of model ecd |
Ongoing
|
2023/2024 |
Turkana Central |
Kangatotha |
| Construction and Equipping of new ECDE |
Ongoing
|
2023/2024 |
Turkana North |
NAKALALE |
| Construction and Equipping of New ECDE |
Complete
|
2023/2024 |
Turkana North |
NAKALALE |
| Construction of 1 classroom at korinyang Angarabat boys primary ECD |
Complete
|
2023/2024 |
Aroo |
Katilu |
| Construction of 2 classroom nakurio primary |
Complete
|
2015/2016 |
Lokiriama |
Lokiariama/Lorengikipi |
| Construction of 2 Classrooms |
Complete
|
2020/2021 |
Turkana North |
Lakezone |
| Construction of Canaan ECDE |
Complete
|
2021/2022 |
Turkana Central |
Kanamkemer |
| Construction of changing room and abolition block, fencing of the playing ground |
Stalled
|
2023/2024 |
Turkana Central |
Township |
| Construction of Classrooms at Nasurut ECD |
Stalled
|
2018/2019 |
Turkana Central |
Kalokol |
| Construction of classrooms at VTC in Kalokol |
Complete
|
2018/2019 |
Turkana Central |
Kalokol |
| Construction of dormitory at Lodwar rescue centre |
Complete
|
2021/2022 |
Turkana Central |
Township |
| Construction of Ecd at Kapua |
Complete
|
2015/2016 |
Turkana Central |
Kalokol |
| Construction of Ecd at Lokwar angipirio |
Complete
|
2015/2016 |
Turkana Central |
Kangatotha |
| Construction of Ecd centre |
Stalled
|
2020/2021 |
Turkana South |
Kalapata |
| Construction of Ecde |
Complete
|
2015/2016 |
Lokiriama |
Lokiariama/Lorengikipi |
| Construction of ECDE at Kaeris primary |
Complete
|
2021/2022 |
Turkana North |
Kaeris |
| Construction of ECDE center at Lomil |
Complete
|
2020/2021 |
Loima |
Turkwel |
| Construction of ECDE Centres at Lokitaung |
Not Started
|
2020/2021 |
Turkana North |
Lapur |
| Construction of Echoke ECDE |
Complete
|
2018/2019 |
Turkana East |
Katilia |
| Construction of fence at Lorugum VTC (chain link) |
Complete
|
2021/2022 |
Loima |
Turkwel |
| Construction of kaemanik Ecde |
Complete
|
2018/2019 |
Lokiriama |
Lokiariama/Lorengikipi |
| Construction of kaidir ECDE |
Ongoing
|
2021/2022 |
Lokiriama |
Loima |
| Construction of Kainuk Girls Primary ECD |
Complete
|
2023/2024 |
Aroo |
Lobokat |
| Construction of Kakilala ECDE |
Stalled
|
2021/2022 |
Loima |
Lobei/Kotaruk |
| Construction of Kakiteitei ECDE Centre |
Ongoing
|
2021/2022 |
Suguta |
Kapedo/ Napeitom |
| Construction of kalekol Ecde |
Not Started
|
2015/2016 |
Loima |
Loima |
| Construction of Kalimapus ECD |
Complete
|
2015/2016 |
Turkana Central |
Kalokol |
| Construction of Kalokol Vocational Training Centre |
Complete
|
2015/2016 |
Turkana Central |
Kalokol |
| Construction of Kapokor ECDE |
Complete
|
2018/2019 |
Turkana Central |
Kalokol |
| Construction of Kataboi VTC Dormitory |
Not Started
|
2023/2024 |
Turkana North |
Lakezone |
| Construction of Lochor alomalaa ECDE |
Complete
|
2018/2019 |
Lokiriama |
Lokiariama/Lorengikipi |
| Construction of locker edom ecde |
Complete
|
2014/2015 |
Lokiriama |
Loima |
| Construction of Lodoket Engol Ecd |
Not Started
|
2021/2022 |
Turkana Central |
Kerio Delta |
| Construction of lokaliban ECDE |
Stalled
|
2021/2022 |
Turkana North |
Kaeris |
| Construction of Lomukusei ECDE |
Complete
|
2014/2015 |
Lokiriama |
Loima |
| Construction of lopeduru ecde |
Complete
|
2013/2014 |
Lokiriama |
Loima |
| Construction of Lopii ECDE |
Not Started
|
2021/2022 |
Turkana East |
Lokori/Kochodin |
| Construction of model ecd at Lochwaarengan |
Not Started
|
2022/2023 |
Turkana Central |
Kalokol |
| Construction of model Ecd at Longech |
Complete
|
2023/2024 |
Turkana Central |
Kangatotha |
| Construction of model Ecd at Nameritaba |
Complete
|
2023/2024 |
Turkana Central |
Kalokol |
| Construction of model ECD centre |
Stalled
|
2019/2020 |
Turkana West |
Kalobeyei |
| Construction of model ECDE |
Complete
|
2023/2024 |
Turkana West |
Kalobeyei |
| Construction of Model ECDE |
Not Started
|
2023/2024 |
Loima |
Lobei/Kotaruk |
| Construction of model ECDE |
Complete
|
2020/2021 |
Lokichogio |
Nanam |
| Construction of model ECDE |
Stalled
|
2020/2021 |
Turkana West |
Kalobeyei |
| Construction of Model ECDE Centre |
Ongoing
|
2020/2021 |
Turkana East |
Katilia |
| Construction of Model ECDE Centre |
Complete
|
2020/2021 |
Turkana East |
Katilia |
| Construction of Model ECDE Centre |
Not Started
|
2020/2021 |
Turkana East |
Katilia |
| Construction of model ECDE centre |
Complete
|
2020/2021 |
Turkana West |
Kalobeyei |
| Construction of model ECDE centre |
Complete
|
2020/2021 |
Lokichogio |
Songot |
| Construction of model ECDE Centre |
Complete
|
2020/2021 |
Turkana Central |
Kanamkemer |
| Construction of model ECDE Centre |
Complete
|
2020/2021 |
Turkana North |
Kaeris |
| Construction of Morungor Ecd |
Complete
|
2013/2014 |
Turkana Central |
Kalokol |
| Construction of Morungor Ecd |
Complete
|
2013/2014 |
Turkana Central |
Kalokol |
| Construction of Nakadukui Ecd |
Complete
|
2014/2015 |
Turkana Central |
Kangatotha |
| Construction of Nakechichok Ecd |
Complete
|
2014/2015 |
Turkana Central |
Kerio Delta |
| Construction of Nakorimunyen ecde |
Complete
|
2014/2015 |
Lokiriama |
Loima |
| Construction of Nakoriongora ECDE |
Complete
|
2021/2022 |
Turkana Central |
Township |
| Construction of Nakudet Ecd |
Complete
|
2015/2016 |
Turkana Central |
Kerio Delta |
| Construction of Nakurio Ecde |
Complete
|
2014/2015 |
Lokiriama |
Lokiariama/Lorengikipi |
| Construction of Nakwapua ECDE |
Complete
|
2013/2014 |
Lokiriama |
Lokiariama/Lorengikipi |
| Construction of Nakwasinyen ECD |
Complete
|
2014/2015 |
Turkana Central |
Kalokol |
| Construction of Namerisinyen Ecd |
Complete
|
2014/2015 |
Turkana Central |
Kalokol |
| Construction of Namoruputh ecde |
Complete
|
2015/2016 |
Lokiriama |
Loima |
| Construction of Nangolebei ecd |
Complete
|
2014/2015 |
Turkana Central |
Kerio Delta |
| Construction of Nariemet ECD |
Complete
|
2013/2014 |
Turkana Central |
Kalokol |
| Construction of Nariemet ECD |
Complete
|
2013/2014 |
Turkana Central |
Kalokol |
| Construction of Narukopo Ecd centre |
Complete
|
2021/2022 |
Turkana Central |
Kalokol |
| Construction of Nasura Ecd |
Complete
|
2015/2016 |
Turkana Central |
Kangatotha |
| Construction of Nauriendudung ECDE |
Not Started
|
2023/2024 |
Loima |
Loima |
| Construction of Nayanae asajait Ecde |
Complete
|
2023/2024 |
Lokiriama |
Loima |
| Construction of new ECD |
Complete
|
2023/2024 |
Turkana North |
Kaeris |
| Construction of new ECDE |
Complete
|
2019/2020 |
Turkana Central |
Kanamkemer |
| Construction of New ECDE |
Ongoing
|
2023/2024 |
Suguta |
Kapedo/ Napeitom |
| Construction of New Ecde at Lochor Angalalio |
Not Started
|
2019/2020 |
Lokiriama |
Lokiariama/Lorengikipi |
| Construction of Ngataparin Ecd |
Not Started
|
2018/2019 |
Turkana Central |
Kerio Delta |
| Construction of one classroom -ECD in Kalemungorok |
Complete
|
2021/2022 |
Aroo |
Katilu |
| Construction of one classroom at Kaikir ECDE |
Complete
|
2021/2022 |
Turkana Central |
Kanamkemer |
| Construction of store at lodwar rescue centre |
Stalled
|
2021/2022 |
Turkana Central |
Township |
| Construction of Twin classrooms at Kalokol VTC |
Complete
|
2020/2021 |
Turkana Central |
Kalokol |
| Construction of urum ecde |
Complete
|
2013/2014 |
Lokiriama |
Lokiariama/Lorengikipi |
| ECD Kakongu |
Complete
|
2013/2014 |
Aroo |
Lobokat |
| ECDE at Lokitaung Primary 2018/2019 |
Complete
|
2018/2019 |
Turkana North |
Lapur |
| Ecde play equipment Lorengikipi ecde |
Complete
|
2019/2020 |
Lokiriama |
Lokiariama/Lorengikipi |
| Elelea ECDE |
Complete
|
2013/2014 |
Turkana Central |
Kanamkemer |
| Equipping of dormitory at lodwar rescue centre |
Complete
|
2023/2024 |
Turkana Central |
Township |
| Equipping of Lodwar rescue centre/electricity installation |
Complete
|
2019/2020 |
Turkana Central |
Township |
| Equipping of Namoruputh social Hall PWD |
Complete
|
2020/2021 |
Lokiriama |
Loima |
| Fencing of Ekalees Sports Stadium and refurbishment of offices |
Complete
|
2021/2022 |
Turkana Central |
Kanamkemer |
| Fencing of playing ground and construction of abolition block |
Complete
|
2023/2024 |
Lokiriama |
Loima |
| IDP camp ECDE |
Complete
|
2014/2015 |
Turkana Central |
Township |
| IDP camp ECDE |
Complete
|
2014/2015 |
Turkana Central |
Township |
| Installation of improved biomass cook stove at Naregaekamar Primary school |
Complete
|
2020/2021 |
Aroo |
Lobokat |
| Installation of improved biomass cook stoves purchase of specialized materials |
Complete
|
2020/2021 |
Aroo |
Katilu |
| Juluk ECD |
Complete
|
2014/2015 |
Aroo |
Kaputir |
| Juluk ECDE |
Complete
|
2013/2014 |
Turkana Central |
Kanamkemer |
| Kaameyan Ecde |
Complete
|
2023/2024 |
Turkana West |
Letea |
| Kaareman ECD |
Complete
|
2015/2016 |
Aroo |
Katilu |
| Kaaruko ECDE |
Complete
|
2013/2014 |
Suguta |
Kapedo/ Napeitom |
| Kaemothia ECD |
Not Started
|
2015/2016 |
Kibish |
Kibish |
| Kaimegur |
Stalled
|
2023/2024 |
Turkana South |
Kalapata |
| Kainuk ECD(Alnoor Primary) |
Complete
|
2015/2016 |
Aroo |
Lobokat |
| Kainuk primary ECD |
Complete
|
2014/2015 |
Aroo |
Lobokat |
| Kaitiwo ECD |
Complete
|
2020/2021 |
Aroo |
Kaputir |
| Kakalel ECD |
Complete
|
2014/2015 |
Turkana South |
Kalapata |
| Kakemera ECDE |
Complete
|
2014/2015 |
Turkana Central |
Kanamkemer |
| Kalemnyang ECDE |
Complete
|
2013/2014 |
Loima |
Lobei/Kotaruk |
| Kalemnyang ECDE |
Complete
|
2013/2014 |
Loima |
Lobei/Kotaruk |
| Kalobeyei ECD |
Complete
|
2014/2015 |
Turkana West |
Kalobeyei |
| Kalodicha ECDE |
Complete
|
2015/2016 |
Turkana South |
Kalapata |
| Kalokutanyang' |
Complete
|
2014/2015 |
Loima |
Turkwel |
| Kalosep ECDE |
Complete
|
2014/2015 |
Turkana North |
Lakezone |
| Kamuge ECDE |
Complete
|
2014/2015 |
Suguta |
Kapedo/ Napeitom |
| Kangacheria ECDE |
Complete
|
2023/2024 |
Loima |
Lobei/Kotaruk |
| Kangakipur ECD |
Complete
|
2013/2014 |
Turkana North |
Kaeris |
| Kangimanyin ECD |
Complete
|
2021/2022 |
Turkana South |
Kalapata |
| Kangitit ECD |
Complete
|
2015/2016 |
Turkana East |
Lokori/Kochodin |
| Kapedo ECDE |
Complete
|
2013/2014 |
Suguta |
Kapedo/ Napeitom |
| Kapelbok ECD |
Complete
|
2013/2014 |
Aroo |
Kaputir |
| Kasuroi ECDE |
Ongoing
|
2021/2022 |
Turkana South |
Lokichar |
| Kataboi Vocational Training Centre (Two)Classrooms |
Complete
|
2016/2017 |
Turkana North |
Lakezone |
| Kataboi Vocational Training Centre(Two Classrooms) |
Stalled
|
2016/2017 |
Turkana North |
Lakezone |
| Kataboi Youth Polytechnic |
Stalled
|
2014/2015 |
Turkana North |
Lakezone |
| Katiir ECDE |
Stalled
|
2020/2021 |
Turkana South |
Kalapata |
| Katilia ECD |
Complete
|
2013/2014 |
Turkana East |
Katilia |
| Kengolereng |
Complete
|
2015/2016 |
Turkana South |
Lokichar |
| Kibish Ecd |
Complete
|
2013/2014 |
Kibish |
Kibish |
| Kidewa classroom |
Complete
|
2015/2016 |
Turkana East |
Katilia |
| Kimabur ECD |
Complete
|
2020/2021 |
Turkana South |
Lokichar |
| Kobuin ECD |
Complete
|
2019/2020 |
Turkana North |
NAKALALE |
| Komudei Ecde |
Complete
|
2014/2015 |
Turkana West |
Kakuma |
| Komudei Ecde (Play & Other Materials) |
Complete
|
2020/2021 |
Turkana West |
Kakuma |
| Koputiro ECD |
Complete
|
2014/2015 |
Aroo |
Lobokat |
| Koyasa Ecd |
Complete
|
2013/2014 |
Kibish |
Kibish |
| Lavelling of Lokitaung Playing Ground and Construction of Abolition Block |
Not Started
|
2023/2024 |
Turkana North |
Lapur |
| Legion of Mary ECDE |
Complete
|
2013/2014 |
Turkana Central |
Township |
| Letea Ecde |
Stalled
|
2018/2019 |
Turkana West |
Letea |
| Levelling of playing fields and purchase of sports equipment |
Not Started
|
2021/2022 |
Turkana East |
Lokori/Kochodin |
| Levelling of playing ground at lodwar rescue centre |
Complete
|
2023/2024 |
Turkana Central |
Township |
| Lobaanga Ecde |
Complete
|
2015/2016 |
Turkana West |
Lopur |
| Lobei ECDE |
Complete
|
2023/2024 |
Loima |
Lobei/Kotaruk |
| Loborot ECDE |
Complete
|
2015/2016 |
Turkana Central |
Kanamkemer |
| Lobulono ECD |
Complete
|
2015/2016 |
Kibish |
Kibish |
| Lochor Edome ECD |
Complete
|
2013/2014 |
Turkana North |
Lapur |
| Lochoredome |
Stalled
|
2020/2021 |
Turkana West |
Lopur |
| Lochoredome Ecde |
Complete
|
2015/2016 |
Turkana West |
Lopur |
| Lodwar Youth Polytechnic |
Complete
|
2014/2015 |
Turkana Central |
Township |
| Lokaburu ECDE |
Complete
|
2020/2021 |
Turkana South |
Lokichar |
| Lokamarinyang |
Complete
|
2014/2015 |
Kibish |
Kibish |
| Lokichar IDP ECDE |
Complete
|
2020/2021 |
Turkana South |
Kalapata |
| Lokicheda ECD |
Complete
|
2013/2014 |
Turkana East |
Lokori/Kochodin |
| Lokichida ECD |
Complete
|
2013/2014 |
Turkana East |
Lokori/Kochodin |
| Lokipoto Ecde |
Not Started
|
2014/2015 |
Turkana West |
Letea |
| Lokiriama ECDE |
Complete
|
2014/2015 |
Lokiriama |
Lokiariama/Lorengikipi |
| Lokitoengaberu ECD |
Complete
|
2013/2014 |
Turkana North |
Lakezone |
| Lokitoliwo ECDE |
Complete
|
2018/2019 |
Turkana South |
Lokichar |
| Lokore ECD |
Complete
|
2015/2016 |
Turkana North |
NAKALALE |
| Lokorkor Classroom |
Complete
|
2016/2017 |
Turkana East |
Katilia |
| Lokorkor Ecd |
Complete
|
2014/2015 |
Turkana East |
Katilia |
| Lokwamor ecd |
Complete
|
2018/2019 |
Turkana West |
Kalobeyei |
| Lokwamosing Ecd |
Complete
|
2014/2015 |
Turkana East |
Lokori/Kochodin |
| Lolemgete |
Complete
|
2013/2014 |
Loima |
Turkwel |
| Lomeleku Ecd |
Complete
|
2015/2016 |
Turkana South |
Kalapata |
| Lomelo Pry ECDE |
Complete
|
2015/2016 |
Suguta |
Kapedo/ Napeitom |
| Lomerimudang ECD |
Stalled
|
2015/2016 |
Aroo |
Kaputir |
| Lomunyanakirionok ECD |
Complete
|
2015/2016 |
Turkana West |
Kalobeyei |
| Lomunyen Akwan ECD |
Ongoing
|
2015/2016 |
Turkana East |
Katilia |
| Lomunyenpus Ecde |
Complete
|
2018/2019 |
Turkana West |
Kakuma |
| Lopeduru Ecd |
Complete
|
2014/2015 |
Turkana East |
Katilia |
| Loperot ECDE |
Complete
|
2013/2014 |
Turkana South |
Kalapata |
| Lorengikipi ECD |
Complete
|
2015/2016 |
Lokiriama |
Lokiariama/Lorengikipi |
| Lorengikipi Edcde renovation works |
Complete
|
2018/2019 |
Lokiriama |
Lokiariama/Lorengikipi |
| Lorugum citizen Resource center |
Complete
|
2014/2015 |
Loima |
Turkwel |
| Lorugum vocational training center (Two classrooms) |
Stalled
|
2015/2016 |
Loima |
Turkwel |
| Lorugum VTC renovation |
Complete
|
2018/2019 |
Loima |
Turkwel |
| Lorugum VTC renovation |
Complete
|
2018/2019 |
Loima |
Turkwel |
| Lorugum Youth polytechnic |
Complete
|
2014/2015 |
Loima |
Turkwel |
| Lotakaa Ecde |
Complete
|
2014/2015 |
Turkana South |
Kakuma |
| Loyapat ECD |
Complete
|
2013/2014 |
Aroo |
Lobokat |
| Maintenance of solar system Namoruputh primary |
Complete
|
2020/2021 |
Lokiriama |
Loima |
| Model Ecd - play and other materials |
Complete
|
2020/2021 |
Turkana Central |
Kangatotha |
| Model Ecd - play and other materials at Kamekwi |
Complete
|
2020/2021 |
Turkana Central |
Kerio Delta |
| Model ECD center play and other |
Complete
|
2020/2021 |
Aroo |
Kaputir |
| Model ECD center play and other in kakongu |
Complete
|
2013/2014 |
Aroo |
Lobokat |
| Model ECD center play materials and other |
Complete
|
2020/2021 |
Aroo |
Lobokat |
| Model ECD Centre paly and other materials |
Not Started
|
2019/2020 |
Lokiriama |
Lokiariama/Lorengikipi |
| Model ECD centre play and other materials |
Stalled
|
2019/2020 |
Turkana West |
Kalobeyei |
| Model ECD centre play and other materials |
Stalled
|
2019/2020 |
Turkana West |
Kalobeyei |
| Model Ecd centre- play and other materials |
Complete
|
2020/2021 |
Turkana Central |
Kerio Delta |
| Model Ecde - play and other materials |
Complete
|
2020/2021 |
Turkana Central |
Kangatotha |
| Model ecde - play materials at Kalimapus Ecd |
Complete
|
2020/2021 |
Turkana Central |
Kalokol |
| Model ECDE center play and other |
Complete
|
2020/2021 |
Aroo |
Kaputir |
| Model ECDE center play and other materials |
Complete
|
2020/2021 |
Loima |
Lobei/Kotaruk |
| Model ECDE center play and other materials |
Complete
|
2020/2021 |
Loima |
Turkwel |
| Model ECDE Centre - Play and other materials |
Not Started
|
2018/2019 |
Turkana East |
Lokori/Kochodin |
| Model ECDE Centre - Play and other materials in Kamuge ECD |
Ongoing
|
2019/2020 |
Suguta |
Kapedo/ Napeitom |
| Model ECDE Centre - Play and other materials Ngilukia ECDE |
Not Started
|
2019/2020 |
Suguta |
Kapedo/ Napeitom |
| Model ECDE Centre Play and other material |
Complete
|
2020/2021 |
Turkana North |
Lakezone |
| Model ECDE Centre play and other materials |
Complete
|
2019/2020 |
Turkana Central |
Kanamkemer |
| Model ECDE Centre play and other materials |
Stalled
|
2019/2020 |
Turkana Central |
Kanamkemer |
| Model ECDE Centre Play and Other Materials |
Complete
|
2020/2021 |
Turkana East |
Lokori/Kochodin |
| Model ECDE centre play and other materials |
Complete
|
2020/2021 |
Lokichogio |
Songot |
| Model ECDE Centre play and other materials |
Complete
|
2020/2021 |
Turkana Central |
Township |
| Model ECDE Centre play and other materials |
Not Started
|
2020/2021 |
Suguta |
Kapedo/ Napeitom |
| Model ECDE centre play and other materials |
Complete
|
2020/2021 |
Lokichogio |
Songot |
| Model ECDE Centre Play and other materials |
Not Started
|
2020/2021 |
Suguta |
Kapedo/ Napeitom |
| Model ECDE centre play and other materials |
Complete
|
2020/2021 |
Lokichogio |
Nanam |
| Model ECDE centre play and other materials |
Complete
|
2020/2021 |
Turkana West |
Kalobeyei |
| Model ECDE centre play and other materials |
Complete
|
2020/2021 |
Turkana West |
Kalobeyei |
| Model ECDE centre play and other materials |
Complete
|
2020/2021 |
Lokichogio |
Nanam |
| Model ECDE centre play and other materials |
Complete
|
2020/2021 |
Lokichogio |
Lokichoggio |
| Model ECDE Centre play and other materials |
Complete
|
2020/2021 |
Turkana East |
Katilia |
| Model ECDE centre play and other materials |
Complete
|
2020/2021 |
Lokichogio |
Lokichoggio |
| Model ECDE Centre play and other materials |
Complete
|
2020/2021 |
Turkana East |
Katilia |
| Model ECDE Centre Play and Other Materials |
Complete
|
2020/2021 |
Turkana North |
Lakezone |
| Model ECDE Centre play and other materials |
Complete
|
2020/2021 |
Turkana North |
Kaeris |
| Model ECDE Centre play and other materials |
Complete
|
2020/2021 |
Turkana Central |
Kanamkemer |
| Model ECDE Centre play and other materials |
Complete
|
2020/2021 |
Turkana Central |
Township |
| Model ECDE Centre Play and Other Materials |
Complete
|
2020/2021 |
Kibish |
Kibish |
| Model ECDE centre play and other materials |
Complete
|
2020/2021 |
Turkana North |
NAKALALE |
| Model ECDE centre play and other materials |
Complete
|
2020/2021 |
Turkana North |
Kaleng/kaikor |
| Model ECDE Centre Play and Other Materials |
Complete
|
2020/2021 |
Turkana North |
Lapur |
| Model ecde Centre play namoruputh ecde/narionomor |
Complete
|
2020/2021 |
Lokiriama |
Loima |
| Model ECDE Centre-Play and other materials |
Not Started
|
2019/2020 |
Turkana North |
Lapur |
| Model ecde play and other material |
Complete
|
2019/2020 |
Lokiriama |
Loima |
| Model ecde play material kalelekol ecde |
Not Started
|
2020/2021 |
Loima |
Loima |
| Model Ecde-Play materials at Impessa |
Complete
|
2020/2021 |
Turkana Central |
Kalokol |
| Model ECDeE Centre play material |
Complete
|
2020/2021 |
Lokiriama |
Lokiariama/Lorengikipi |
| Modern elder Centre play and other material urum ecde |
Complete
|
2020/2021 |
Lokiriama |
Lokiariama/Lorengikipi |
| Morulem ECD |
Not Started
|
2014/2015 |
Turkana East |
Lokori/Kochodin |
| Music Ecde |
Complete
|
2014/2015 |
Turkana West |
Letea |
| Musug Ecde |
Stalled
|
2020/2021 |
Turkana West |
Letea |
| Nadapal ECDE |
Complete
|
2022/2023 |
Loima |
Turkwel |
| Nadidinget/Nawatom ECD |
Complete
|
2014/2015 |
Turkana West |
Kalobeyei |
| Naduat ECD |
Complete
|
2014/2015 |
Turkana North |
NAKALALE |
| Naipa ECDE |
Stalled
|
2020/2021 |
Loima |
Lobei/Kotaruk |
| Nakaalei ECDE |
Complete
|
2020/2021 |
Turkana South |
Kalapata |
| Nakabosan ECD |
Complete
|
2024/2025 |
Aroo |
Katilu |
| Nakalalioit ECD |
Complete
|
2013/2014 |
Turkana North |
Kaeris |
| Nakapelewoi ECD |
Complete
|
2013/2014 |
Turkana North |
Kaeris |
| Nakinomet ECD |
Stalled
|
2015/2016 |
Turkana North |
Kaleng/kaikor |
| Nakitoekirion ECDE |
Complete
|
2013/2014 |
Loima |
Turkwel |
| Nakitongo Ecde |
Not Started
|
2018/2019 |
Turkana West |
Letea |
| Nakoriongora ECDE |
Complete
|
2015/2016 |
Turkana Central |
Township |
| Nakuse ECD |
Stalled
|
2014/2015 |
Aroo |
Kaputir |
| Nakwamekwi ECDE |
Complete
|
2014/2015 |
Turkana Central |
Township |
| Nakwamoru ECD |
Complete
|
2013/2014 |
Aroo |
Kaputir |
| Nalemkais ECDE |
Complete
|
2018/2019 |
Turkana South |
Kalapata |
| Namon Ecde |
Complete
|
2014/2015 |
Turkana West |
Lopur |
| Naotin ECDE |
Complete
|
2014/2015 |
Turkana Central |
Kanamkemer |
| Napak Ecd |
Complete
|
2014/2015 |
Kibish |
Kibish |
| Napeitom ECDE |
Complete
|
2013/2014 |
Suguta |
Kapedo/ Napeitom |
| Napetao ECDE |
Complete
|
2014/2015 |
Turkana Central |
Kanamkemer |
| Napusmoru ECD |
Complete
|
2013/2014 |
Turkana South |
Lokichar |
| Naregaekamar ECD |
Complete
|
2024/2025 |
Aroo |
Lobokat |
| Nariamawoi ECD |
Stalled
|
2023/2024 |
Turkana South |
Kalapata |
| Nariokotome Solar ECD |
Not Started
|
2015/2016 |
Turkana North |
Lakezone |
| Naroo ECDE |
Complete
|
2021/2022 |
Turkana South |
Lokichar |
| Naroo ECDE lochor Emoit |
Stalled
|
2021/2022 |
Turkana South |
Lokichar |
| Nasechabuin ECDE |
Stalled
|
2018/2019 |
Turkana North |
Lakezone |
| Natambusio ECDE |
Complete
|
2013/2014 |
Turkana Central |
Township |
| Natiira ECD |
Complete
|
2014/2015 |
Turkana West |
Kalobeyei |
| Natiira ECD |
Complete
|
2014/2015 |
Turkana West |
Kalobeyei |
| Natiira primary school solar project |
Complete
|
2015/2016 |
Turkana West |
Kalobeyei |
| Natodomeri ECD |
Stalled
|
2015/2016 |
Kibish |
Kibish |
| Natotol ECDE |
Complete
|
2015/2016 |
Turkana Central |
Township |
| Naukotlem |
Complete
|
2015/2016 |
Turkana East |
Katilia |
| Naukotlem ECD |
Complete
|
2015/2016 |
Turkana East |
Katilia |
| Nawatom ECD |
Complete
|
2013/2014 |
Turkana West |
Kalobeyei |
| Nayanae Katwan ECD |
Complete
|
2013/2014 |
Turkana East |
Lokori/Kochodin |
| Ngaurendiria ECD |
Complete
|
2014/2015 |
Turkana North |
Kaeris |
| Oropoi ECD |
Complete
|
2014/2015 |
Turkana West |
Kalobeyei |
| Oropoi ECD |
Complete
|
2014/2015 |
Turkana West |
Kalobeyei |
| Philadelphia ECD |
Complete
|
2015/2016 |
Aroo |
Lobokat |
| Philadelphia ECD playing materials |
Complete
|
2024/2025 |
Aroo |
Lobokat |
| Playing Materials |
Complete
|
2020/2021 |
Aroo |
Lobokat |
| Proposed construction of a dormitory in Lodwar rescue centre |
Complete
|
2018/2019 |
Turkana Central |
Township |
| Proposed construction of ECDE one classroom at immaculate Primary school |
Complete
|
2023/2024 |
Aroo |
Katilu |
| Proposed construction of kadunyangole ECDE |
Complete
|
2018/2019 |
Turkana Central |
Kanamkemer |
| Proposed construction of Kawalase ECDE |
Not Started
|
2018/2019 |
Turkana Central |
Township |
| Proposed construction of Lotubae ECDE |
Complete
|
2018/2019 |
Turkana East |
Lokori/Kochodin |
| Proposed construction of Nakwamekwi ECDE in Lodwar Township |
Not Started
|
2018/2019 |
Turkana Central |
Township |
| Proposed construction of Two ECDE school at Kaekamuto |
Stalled
|
2019/2020 |
Aroo |
Katilu |
| Proposed Rehabilitation of classrooms |
Complete
|
2019/2020 |
Turkana South |
Lokichar |
| Purchase of Office Furniture and Fittings |
Not Started
|
2021/2022 |
Turkana North |
Lakezone |
| Purchase of Student Chairs |
Complete
|
2021/2022 |
Turkana North |
Lakezone |
| RCEA ECD |
Complete
|
2015/2016 |
Aroo |
Kaputir |
| Refurbishment of ECD Center |
Complete
|
2021/2022 |
Turkana North |
Kaeris |
| Refurbishment of ECD center and Roofing |
Stalled
|
2021/2022 |
Aroo |
Katilu |
| Refurbishment of ECDE Center and Fencing |
Complete
|
2021/2022 |
Turkana North |
Lakezone |
| Refurbishment of latrines at Lodwar rescue centre |
Complete
|
2021/2022 |
Turkana Central |
Township |
| Rehabilitation of Lodwar showground |
Complete
|
2018/2019 |
Turkana Central |
Township |
| Renovation and Additional works |
Not Started
|
2019/2020 |
Turkana North |
Lapur |
| Renovation and Additional Works |
Not Started
|
2019/2020 |
Kibish |
Kibish |
| Renovation and additional works |
Ongoing
|
2020/2021 |
Suguta |
Kapedo/ Napeitom |
| Renovation and additional works |
Complete
|
2019/2020 |
Suguta |
Kapedo/ Napeitom |
| Renovation and Additional works |
Complete
|
2020/2021 |
Turkana East |
Katilia |
| Renovation and additional works |
Complete
|
2020/2021 |
Lokichogio |
Songot |
| Renovation and Additional works |
Not Started
|
2020/2021 |
Turkana North |
Lapur |
| Renovation and additional works |
Complete
|
2020/2021 |
Lokichogio |
Nanam |
| Renovation and additional works (Lokicheda ecd) |
Complete
|
2020/2021 |
Turkana East |
Lokori/Kochodin |
| Renovation and additional works(kainuk primary ECD) |
Complete
|
2020/2021 |
Aroo |
Lobokat |
| Renovation and additional works(Koputiro ECD) |
Complete
|
2020/2021 |
Aroo |
Lobokat |
| Renovation of Ecd at Merier |
Complete
|
2020/2021 |
Turkana Central |
Kerio Delta |
| Renovation of ECDE Centre amd Equipping with desks |
Complete
|
2023/2024 |
Turkana North |
Lakezone |
| Renovation of ECDE Centre and Equipping with Desks |
Complete
|
2023/2024 |
Turkana North |
Lakezone |
| Renovation of ECDE Centre and Equipping with desks |
Complete
|
2023/2024 |
Turkana North |
Lakezone |
| Renovation of elelea ECDE |
Complete
|
2020/2021 |
Turkana Central |
Kanamkemer |
| Renovation of kalelekol Ecde |
Not Started
|
2018/2019 |
Loima |
Loima |
| Renovation of Loyapat ECD center |
Complete
|
2024/2025 |
Aroo |
Lobokat |
| Renovation of VTC Classrooms |
Not Started
|
2021/2022 |
Turkana East |
Lokori/Kochodin |
| Renovation works at lomukusei ecde |
Complete
|
2018/2019 |
Lokiriama |
Loima |
| Repair of Kikeunae ECD centre |
Complete
|
2020/2021 |
Lokichogio |
Lokichoggio |
| Sasak Echoke ECDE |
Complete
|
2014/2015 |
Loima |
Lobei/Kotaruk |
| Silale ECDE |
Complete
|
2014/2015 |
Suguta |
Kapedo/ Napeitom |
| St Michael Primary ECDE |
Complete
|
2014/2015 |
Turkana Central |
Township |
| St Michael Primary ECDE |
Complete
|
2014/2015 |
Turkana Central |
Township |
| Supply and delivery of playing materials at lodwar rescue centre |
Complete
|
2023/2024 |
Turkana Central |
Township |
| Three Class Room Kochodin Secondary |
Not Started
|
2015/2016 |
Turkana East |
Lokori/Kochodin |
| Towokayeni Ecde |
Stalled
|
2015/2016 |
Turkana West |
Kakuma |
| Towokayeni Ecde (Additional Works) |
Not Started
|
2020/2021 |
Turkana West |
Kakuma |
| Two classrooms at Lorugum VTC and twin workshop |
Stalled
|
2018/2019 |
Loima |
Turkwel |