| Akwangat Borehole |
Complete
|
2015/2016 |
Turkana West |
Kakuma |
| Construction of Adakar kaapalokaal water project |
Stalled
|
2023/2024 |
Turkana East |
Lokori/Kochodin |
| Construction of Adminitration block,dining hall and Parade Square |
Not Started
|
2023/2024 |
Turkana North |
Lapur |
| Construction of county warehouse |
Not Started
|
2023/2024 |
Turkana Central |
Kanamkemer |
| Construction of dam in Kalemungorok |
Stalled
|
2021/2022 |
Aroo |
Katilu |
| Construction of Exsitu soil and water conservation and rain water harvesting structures at Kalemungorok |
Stalled
|
2019/2020 |
Aroo |
Katilu |
| Construction of Exsitu soil and water conservation and Rain water harvesting structures at Kibish |
Not Started
|
2019/2020 |
Kibish |
Kibish |
| Construction of In-situ rain water harvesting and management structures |
Stalled
|
2020/2021 |
Turkana South |
Kalapata |
| Construction of institutions rain water harvesting and management structures more ankadelio |
Complete
|
2019/2020 |
Lokiriama |
Lokiariama/Lorengikipi |
| Construction of Kachoda Trading Centre water Project |
Complete
|
2023/2024 |
Turkana North |
Lapur |
| Construction of Kanamkemer Ward Office |
Complete
|
2013/2014 |
Turkana Central |
Kanamkemer |
| Construction of Kangirisae water pan |
Complete
|
2018/2019 |
Turkana Central |
Kerio Delta |
| Construction of Kangirisae water pan |
Complete
|
2018/2019 |
Turkana Central |
Kerio Delta |
| Construction of kochode Water pan |
Stalled
|
2016/2017 |
Lokiriama |
Loima |
| Construction of Loima ward admin office |
Complete
|
2014/2015 |
Lokiriama |
Loima |
| Construction of Lokapirchit/Napakali Water project |
Complete
|
2023/2024 |
Lokiriama |
Lokiariama/Lorengikipi |
| Construction of Lokitolio |
Complete
|
2019/2020 |
Loima |
Loima |
| Construction of lokwatuba rock catchment |
Complete
|
2020/2021 |
Loima |
Loima |
| Construction of Nangoleki Water pan |
Complete
|
2016/2017 |
Lokiriama |
Loima |
| Construction of Naputare Waterpan |
Not Started
|
2021/2022 |
Turkana East |
Katilia |
| Construction of Office Block at Inspectorate Training Institute |
Complete
|
2021/2022 |
Turkana North |
Lapur |
| Construction of Paski water |
Complete
|
2015/2016 |
Lokiriama |
Lokiariama/Lorengikipi |
| Construction of plastic collection warehouse and underground water tank at lokaparaparae |
Ongoing
|
2020/2021 |
Turkana Central |
Township |
| Construction of Turkana Kibish Sub County Offices |
Not Started
|
2019/2020 |
Kibish |
Kibish |
| Construction of Two(2) No. Classroom Block at Inspectorate Training Institute |
Complete
|
2021/2022 |
Turkana North |
Lapur |
| Construction of urum Water pan |
Not Started
|
2019/2020 |
Lokiriama |
Lokiariama/Lorengikipi |
| Construction of urum Water pan-Ngipiriae |
Complete
|
2013/2014 |
Lokiriama |
Lokiariama/Lorengikipi |
| Construction of ward admin office |
Complete
|
2013/2014 |
Turkana Central |
Kalokol |
| Desalination of napetao borehole |
Stalled
|
2020/2021 |
Turkana Central |
Kanamkemer |
| Drilling and Equiping of Lohwa-ilema |
Complete
|
2023/2024 |
Lokiriama |
Loima |
| Drilling and Equiping of Nakwapua borehole |
Complete
|
2014/2015 |
Lokiriama |
Lokiariama/Lorengikipi |
| Drilling and Equipping kokorilem borehole |
Complete
|
2015/2016 |
Aroo |
Katilu |
| Drilling and equipping of a borehole |
Complete
|
2014/2015 |
Turkana South |
Kalapata |
| Drilling and equipping of a borehole |
Complete
|
2014/2015 |
Turkana South |
Kalapata |
| Drilling and Equipping of Angeles borehole |
Complete
|
2015/2016 |
Aroo |
Katilu |
| Drilling and equipping of borehole at Ikalale dispensary |
Ongoing
|
2020/2021 |
Lokichogio |
Nanam |
| Drilling and Equipping of borehole at ikingol kaeris Ward |
Complete
|
2020/2021 |
Turkana North |
Kaeris |
| Drilling and equipping of Elelea borehole |
Stalled
|
2015/2016 |
Turkana West |
Kalobeyei |
| Drilling and Equipping of Juluk borehole |
Complete
|
2014/2015 |
Aroo |
Kaputir |
| Drilling and Equipping of Juluk borehole 2 |
Complete
|
2014/2015 |
Aroo |
Kaputir |
| Drilling and Equipping of kabilkeret borehole |
Complete
|
2014/2015 |
Turkana North |
Kaeris |
| Drilling and Equipping of kaekamuto borehole |
Complete
|
2014/2015 |
Aroo |
Katilu |
| Drilling and equipping of Kainuk borehole |
Complete
|
2014/2015 |
Aroo |
Lobokat |
| Drilling and equipping of Kainuk sec Borehole |
Complete
|
2014/2015 |
Aroo |
Lobokat |
| Drilling and equipping of Kakimat borehole |
Stalled
|
2014/2015 |
Turkana Central |
Kerio Delta |
| Drilling and Equipping of Kakongu 1 borehole |
Complete
|
2015/2016 |
Aroo |
Lobokat |
| Drilling and Equipping of Kakongu 2 borehole |
Stalled
|
2015/2016 |
Aroo |
Lobokat |
| Drilling and Equipping of Kakongu primary school borehole |
Complete
|
2015/2016 |
Aroo |
Lobokat |
| Drilling and equipping of Kakula borehole |
Complete
|
2014/2015 |
Turkana Central |
Kerio Delta |
| Drilling and Equipping of kamuge borehole |
Complete
|
2015/2016 |
Suguta |
Kapedo/ Napeitom |
| Drilling and Equipping of kangimonginarengak borehole |
Complete
|
2014/2015 |
Loima |
Loima |
| Drilling and equipping of Kangipetain borehole |
Complete
|
2015/2016 |
Turkana East |
Lokori/Kochodin |
| Drilling and Equipping of kapelbok borehole 1 |
Complete
|
2014/2015 |
Aroo |
Kaputir |
| Drilling and Equipping of kapelbok borehole 2 |
Complete
|
2014/2015 |
Aroo |
Kaputir |
| Drilling and equipping of Katamanak borehole |
Complete
|
2014/2015 |
Turkana East |
Lokori/Kochodin |
| Drilling and Equipping of Katiko Borehole |
Not Started
|
2021/2022 |
Turkana North |
Lakezone |
| Drilling and equipping of Katukuri borehole |
Complete
|
2014/2015 |
Loima |
Turkwel |
| Drilling and Equipping of Kibish borehole |
Complete
|
2014/2015 |
Kibish |
Kibish |
| Drilling and Equipping of Lochor Aperu borehole |
Complete
|
2015/2016 |
Lokiriama |
Loima |
| Drilling and equipping of lochor emeyen borehole |
Complete
|
2014/2015 |
Lokiriama |
Loima |
| Drilling and equipping of Lokaburu Borehole |
Complete
|
2023/2024 |
Turkana East |
Katilia |
| Drilling and Equipping of lokalaleakwaan borehole |
Complete
|
2014/2015 |
Turkana North |
Kaleng/kaikor |
| Drilling and equipping of Lokamarinyang borehole |
Complete
|
2014/2015 |
Kibish |
Kibish |
| Drilling and equipping of Lokipetot Arengan borehole |
Stalled
|
2014/2015 |
Loima |
Lobei/Kotaruk |
| Drilling and equipping of Lokwamor borehole |
Complete
|
2015/2016 |
Turkana West |
Kalobeyei |
| Drilling and equipping of Lolupe borehole |
Complete
|
2014/2015 |
Loima |
Turkwel |
| Drilling and equipping of lomanman borehole |
Complete
|
2014/2015 |
Turkana West |
Kalobeyei |
| Drilling and Equipping of Lomeguru borehole |
Complete
|
2014/2015 |
Turkana North |
NAKALALE |
| Drilling and Equipping of lomerimudang borehole |
Complete
|
2014/2015 |
Aroo |
Kaputir |
| Drilling and equipping of Lopeduru borehole |
Stalled
|
2015/2016 |
Turkana East |
Katilia |
| Drilling and equipping of Lorogon Borehole |
Complete
|
2014/2015 |
Aroo |
Kaputir |
| Drilling and equipping of matakul borehole |
Complete
|
2014/2015 |
Turkana West |
Kalobeyei |
| Drilling and equipping of morulem borehole |
Complete
|
2021/2022 |
Turkana East |
Lokori/Kochodin |
| Drilling and Equipping of Nadoto Borehole |
Complete
|
2015/2016 |
Turkana East |
Lokori/Kochodin |
| Drilling and Equipping of nadunga borehole |
Complete
|
2014/2015 |
Turkana North |
Kaeris |
| Drilling and equipping of Nakitogwa borehole |
Complete
|
2015/2016 |
Turkana East |
Katilia |
| Drilling and equipping of Nakurio borehole |
Complete
|
2015/2016 |
Turkana Central |
Kerio Delta |
| Drilling and equipping of Nakurio borehole |
Complete
|
2014/2015 |
Lokiriama |
Lokiariama/Lorengikipi |
| Drilling and Equipping of Nakuse borehole |
Complete
|
2015/2016 |
Aroo |
Kaputir |
| Drilling and equipping of Nalamsekon borehole |
Complete
|
2016/2017 |
Turkana South |
Lokichar |
| Drilling and equipping of Nalapatui 2 borehole |
Complete
|
2015/2016 |
Turkana West |
Kalobeyei |
| Drilling and equipping of Nalapatui borehole |
Complete
|
2015/2016 |
Turkana West |
Kalobeyei |
| Drilling and equipping of nangoleki borehole |
Complete
|
2014/2015 |
Lokiriama |
Loima |
| Drilling and equipping of Napeitom borehole |
Complete
|
2014/2015 |
Suguta |
Kapedo/ Napeitom |
| Drilling and equipping of Napusmoru borehole |
Complete
|
2021/2022 |
Turkana South |
Lokichar |
| Drilling and equipping of Natome borehole |
Complete
|
2014/2015 |
Turkana Central |
Kerio Delta |
| Drilling and Equipping of Ngikengoi Borehole |
Ongoing
|
2023/2024 |
Turkana East |
Katilia |
| Drilling and equipping of Ngikengoi Borehole |
Ongoing
|
2023/2024 |
Turkana East |
Katilia |
| Drilling and Equipping of Upper Nariokotome borehole |
Complete
|
2014/2015 |
Turkana North |
Lakezone |
| Drilling and equipping of urum borehole |
Complete
|
2014/2015 |
Lokiriama |
Lokiariama/Lorengikipi |
| Drilling and equipping of water BH |
Ongoing
|
2025/2026 |
Turkana West |
Kakuma |
| Drilling Equipping and Solarization of Lopuke borehole |
Stalled
|
2023/2024 |
Loima |
Lobei/Kotaruk |
| Drilling Equipping of Loya borehole |
Complete
|
2015/2016 |
Lokiriama |
Lokiariama/Lorengikipi |
| Drilling equipping of namoruputh borehole and improvement at lokwatuba |
Complete
|
2021/2022 |
Lokiriama |
Loima |
| Drilling of kangitit borehole |
Complete
|
2015/2016 |
Turkana East |
Lokori/Kochodin |
| Drilling of Kariwo Borehole |
Complete
|
2015/2016 |
Turkana East |
Lokori/Kochodin |
| Drilling of Lopeduru borehole |
Complete
|
2015/2016 |
Turkana East |
Katilia |
| Drilling of Nadoto borehole |
Complete
|
2014/2015 |
Turkana East |
Lokori/Kochodin |
| Drilling piping and solarization of lokiriama borehole |
Complete
|
2023/2024 |
Lokiriama |
Lokiariama/Lorengikipi |
| Drilling piping and solarization of lokiriama borehole |
Complete
|
2023/2024 |
Lokiriama |
Lokiariama/Lorengikipi |
| Drilling, Piping, Solarization, and Construction of Ngilukia Borehole |
Ongoing
|
2023/2024 |
Suguta |
Kapedo/ Napeitom |
| Drilling,Equipping and piping of water from lochor ekile to lokapelpus |
Complete
|
2020/2021 |
Turkana North |
Kaleng/kaikor |
| Drillling and equipping of Narengo borehole |
Complete
|
2021/2022 |
Turkana Central |
Kangatotha |
| Equipping and solarization of Lorogon Borehole |
Complete
|
2024/2025 |
Aroo |
Kaputir |
| Equipping of Aic Mission Compound Borehole |
Not Started
|
2015/2016 |
Turkana East |
Lokori/Kochodin |
| Equipping of Morulem Secondary Borehole with solar pump |
Complete
|
2015/2016 |
Turkana East |
Lokori/Kochodin |
| Equipping of Napeitom borehole |
Complete
|
2015/2016 |
Suguta |
Kapedo/ Napeitom |
| Equipping of new boreholes ( drilling, solar, hand pumps and gen sets and wind mills) |
Ongoing
|
2023/2024 |
Turkana Central |
Kalokol |
| Extension of Water at Lobulono Dispensary |
Complete
|
2020/2021 |
Kibish |
Kibish |
| Extension of water at Lokwii Dispensary |
Not Started
|
2020/2021 |
Turkana East |
Lokori/Kochodin |
| Extension of water at Natiir Dispensary |
Complete
|
2020/2021 |
Turkana Central |
Kangatotha |
| Feasibility and Appraisal studies for Lomelo Multi-purpose dam |
Not Started
|
2023/2024 |
Suguta |
Kapedo/ Napeitom |
| Fencing of 45 acres piece of the inspectorate Training institute |
Complete
|
2021/2022 |
Turkana North |
Lapur |
| Fencing of Lodwar town food warehouse |
Stalled
|
2023/2024 |
Turkana Central |
Township |
| Flushing and Testing of Lomelo and Napeitom Borehole |
Complete
|
2015/2016 |
Suguta |
Kapedo/ Napeitom |
| Headquarters perimeter wall phase 2 |
Ongoing
|
2023/2024 |
Turkana Central |
Kanamkemer |
| Improvement of Kakiteitei water supply |
Complete
|
2020/2021 |
Suguta |
Kapedo/ Napeitom |
| Improvement of Lodwar water supply |
Complete
|
2020/2021 |
Turkana Central |
Township |
| Improvement of narewa water supply |
Stalled
|
2021/2022 |
Turkana Central |
Kanamkemer |
| Improvement of water facilities at Water supply at lokiriama |
Not Started
|
2021/2022 |
Lokiriama |
Lokiariama/Lorengikipi |
| Improvement of waters supply phase II (Lodwar Municipality) |
Ongoing
|
2023/2024 |
Turkana Central |
Kanamkemer |
| Installation of solar PV system at Lorogon primary |
Complete
|
2020/2021 |
Aroo |
Lorogon |
| Kadongolol Borehole |
Complete
|
2014/2015 |
Turkana South |
Lokichar |
| Kakalel water pan |
Complete
|
2015/2016 |
Turkana South |
Kalapata |
| Kakali Borehole |
Complete
|
2021/2022 |
Turkana South |
Lokichar |
| Kakongu waterpan |
Complete
|
2015/2016 |
Aroo |
Lobokat |
| Kakongu waterpan |
Complete
|
2015/2016 |
Aroo |
Lobokat |
| Kakuma Ward Administrator's Office |
Complete
|
2014/2015 |
Turkana West |
Kakuma |
| Kalobeyei ward administrator office |
Complete
|
2014/2015 |
Turkana West |
Kalobeyei |
| Kamuge water pan |
Not Started
|
2018/2019 |
Suguta |
Kapedo/ Napeitom |
| Kanamesek water pan |
Complete
|
2016/2017 |
Turkana West |
Kalobeyei |
| Kanamkemer Ward Administrator office |
Complete
|
2014/2015 |
Turkana Central |
Kanamkemer |
| Kapese Borehole |
Stalled
|
2023/2024 |
Turkana South |
Lokichar |
| Kaptir waterpan |
Complete
|
2015/2016 |
Aroo |
Kaputir |
| Kapua water pan |
Complete
|
2019/2020 |
Turkana Central |
Kalokol |
| Kareeregai Borehole |
Not Started
|
2023/2024 |
Turkana West |
Lopur |
| Kataboi Water Storage Tank |
Complete
|
2015/2016 |
Turkana North |
Lakezone |
| Katamanak |
Stalled
|
2019/2020 |
Turkana East |
Lokori/Kochodin |
| Katilu ward Administrators office |
Complete
|
2014/2015 |
Aroo |
Katilu |
| Katioko Borehole |
Complete
|
2015/2016 |
Turkana South |
Kalapata |
| Kibish Ward Administrator’s Office |
Complete
|
2013/2014 |
Kibish |
Kibish |
| Kibish Water pan |
Complete
|
2014/2015 |
Kibish |
Kibish |
| Lakezone Ward Administrator’s Office |
Complete
|
2014/2015 |
Turkana North |
Lakezone |
| Lapur Ward Administrator’s Office |
Complete
|
2014/2015 |
Turkana North |
Lapur |
| Lapur Ward Admnistrator’s Office |
Complete
|
2014/2015 |
Turkana North |
Lapur |
| Letea Ward Administrator Office |
Complete
|
2014/2015 |
Turkana West |
Letea |
| Lobokat/Kainuk ward administrator office |
Complete
|
2014/2015 |
Aroo |
Lobokat |
| Lobulono Rock Catchment |
Complete
|
2019/2020 |
Kibish |
Kibish |
| Locher Ikeny water project |
Ongoing
|
2021/2022 |
Turkana Central |
Kangatotha |
| Loitakori Borehole (Drilling and Equipping) |
Complete
|
2015/2016 |
Turkana West |
Kakuma |
| Loitan Water Pan |
Not Started
|
2023/2024 |
Turkana West |
Letea |
| Loitasonyok Borehole |
Complete
|
2014/2015 |
Turkana West |
Letea |
| Lokichar Ward Administrator Office |
Complete
|
2014/2015 |
Turkana South |
Lokichar |
| Lokipoto Water Pan |
Not Started
|
2023/2024 |
Turkana West |
Letea |
| Lokori/Kochodin Ward Admin Office |
Complete
|
2013/2014 |
Turkana East |
Lokori/Kochodin |
| Lomekwi Water Reticulation(Matching Grant with LMS) |
Complete
|
2021/2022 |
Turkana North |
Lakezone |
| Lomil water supply |
Stalled
|
2021/2022 |
Loima |
Turkwel |
| Lopur Ward Administrator office |
Complete
|
2014/2015 |
Turkana West |
Lopur |
| Lopusiki Borehole (Drilling and Equipping) |
Complete
|
2013/2014 |
Turkana West |
Lopur |
| Lorugum hospital |
Complete
|
2019/2020 |
Loima |
Turkwel |
| Lotokino/Namadi Borehole (Drilling and Equipping) |
Complete
|
2020/2021 |
Turkana West |
Letea |
| Lotonguna Borehole |
Complete
|
2015/2016 |
Turkana South |
Kalapata |
| Lowoidapal |
Complete
|
2013/2014 |
Turkana South |
Lokichar |
| Maintenance of tree nursery (Kaitese) |
Complete
|
2023/2024 |
Loima |
Turkwel |
| Nachuki water reticulation |
Complete
|
2021/2022 |
Turkana North |
Lakezone |
| Nachukui Borehole |
Complete
|
2013/2014 |
Turkana North |
Lakezone |
| Nakaalei borehole |
Stalled
|
2014/2015 |
Turkana South |
Kalapata |
| Nakalale ward Administrators office |
Complete
|
2014/2015 |
Turkana North |
NAKALALE |
| Nakatongwa waterpan |
Ongoing
|
2019/2020 |
Turkana East |
Katilia |
| Nakatongwa waterpan disilting |
Complete
|
2020/2021 |
Turkana East |
Katilia |
| Nakitoekakumon water pan |
Complete
|
2015/2016 |
Turkana North |
Kaeris |
| Nakitongo Borehole (Desalination &Piping) |
Complete
|
2020/2021 |
Turkana West |
Letea |
| Nakoyo Borehole |
Not Started
|
2014/2015 |
Turkana West |
Lopur |
| Namorkirionok Borehole (Drilling and Borehole) |
Complete
|
2020/2021 |
Turkana West |
Letea |
| Napeitom water pan |
Stalled
|
2014/2015 |
Suguta |
Kapedo/ Napeitom |
| Napusmoru Water Pan |
Complete
|
2019/2020 |
Turkana South |
Lokichar |
| Nariokotome Borehole |
Complete
|
2015/2016 |
Turkana North |
Lakezone |
| Nataparelim water pan |
Complete
|
2015/2016 |
Turkana West |
Kalobeyei |
| Natodomeri Water Pan |
Complete
|
2019/2020 |
Kibish |
Kibish |
| Naurendiria blue pump protection works |
Complete
|
2019/2020 |
Turkana North |
Kaeris |
| Ngimanimania water pan |
Complete
|
2013/2014 |
Turkana Central |
Kerio Delta |
| Office block |
Stalled
|
2020/2021 |
Turkana Central |
Kanamkemer |
| Parking shades at the ministry headquarters |
Complete
|
2021/2022 |
Turkana Central |
Kanamkemer |
| Proposed construction of perimeter wall at Napuu water aquifer |
Complete
|
2018/2019 |
Turkana Central |
Kanamkemer |
| Proposed improvement of the Lokitaung water supply phase II |
Complete
|
2020/2021 |
Turkana North |
Lapur |
| Purchase of collapsible tanks |
Stalled
|
2023/2024 |
Turkana Central |
Kanamkemer |
| Purchase of drilling materials and tools |
Not Started
|
2023/2024 |
Turkana Central |
Kanamkemer |
| Purchase of geophysical equipment |
Not Started
|
2023/2024 |
Turkana Central |
Kanamkemer |
| Purchase of real time kinematics survey equipment |
Not Started
|
2023/2024 |
Turkana Central |
Kanamkemer |
| Purchase of spare parts for operation and maintenance teams in the sub counties (solar pumps, hand pumps, gensets, wind pumps, pipes and fittings, repair of tanks(plastic tanks, mansory and steel tanks)) |
Not Started
|
2023/2024 |
Turkana Central |
Kanamkemer |
| Purchase of two reverse osmosis plants |
Not Started
|
2023/2024 |
Turkana Central |
Kanamkemer |
| Refurbishment of kaptir Ward office |
Stalled
|
2023/2024 |
Aroo |
Kaputir |
| Refurbishment of Township Ward Administrator office |
Stalled
|
2023/2024 |
Turkana Central |
Township |
| Refurbishment of Ward offices |
Complete
|
2023/2024 |
Turkana North |
Lakezone |
| Rehabilitation of Relapilated irrigation infrastructure at Naurienpuu in Turkwel Ward, Loima |
Stalled
|
2019/2020 |
Loima |
Turkwel |
| Renovation of Kanamkemer Ward Office |
Complete
|
2023/2024 |
Turkana Central |
Kanamkemer |
| Renovation of Kibish Ward Office |
Complete
|
2023/2024 |
Kibish |
Kibish |
| Rogo waterpan |
Complete
|
2015/2016 |
Aroo |
Katilu |
| Solar panel and small works at Loyapat water system |
Complete
|
2021/2022 |
Aroo |
Lobokat |
| Solarization of Kadakungimoe borehole |
Complete
|
2023/2024 |
Turkana North |
NAKALALE |
| Solarization of Namoruputh borehole |
Complete
|
2023/2024 |
Loima |
Loima |
| Supply of water tanks at Lomelo |
Complete
|
2015/2016 |
Suguta |
Kapedo/ Napeitom |
| TCG-Unicef partnership (improvement of water supply nayanae Angikalalio) |
Complete
|
2020/2021 |
Turkana Central |
Township |
| Todonyang Water Pan |
Complete
|
2015/2016 |
Turkana North |
Lakezone |
| Township Ward Administrator office |
Complete
|
2014/2015 |
Turkana Central |
Township |
| Turkwel ward administrator office |
Complete
|
2014/2015 |
Loima |
Turkwel |
| Ward administrator office |
Complete
|
2017/2018 |
Turkana South |
Kalapata |
| Water Installation and Piping |
Complete
|
2020/2021 |
Turkana West |
Letea |
| Water installation and piping at Kalemnyang |
Complete
|
2020/2021 |
Loima |
Turkwel |
| Water installation and pipping at Kalobeyei centre |
Stalled
|
2020/2021 |
Turkana West |
Kalobeyei |
| Water Piping |
Complete
|
2023/2024 |
Turkana Central |
Kanamkemer |
| Water piping at Kalimapus |
Complete
|
2021/2022 |
Turkana Central |
Kalokol |
| Water piping at Kerio/Nakurio |
Not Started
|
2021/2022 |
Turkana Central |
Kerio Delta |
| Water piping in Lokichoggio along UN- Lopiding junction |
Complete
|
2020/2021 |
Lokichogio |
Lokichoggio |
| Water Reticulation at Nachukui |
Complete
|
2020/2021 |
Turkana North |
Lakezone |
| Water reticulation from Naposta to Lorot Akwan village for sustainable water supply |
Ongoing
|
2025/2026 |
Turkana West |
Songot |
| Water supply to county headquarters from Napuu |
Complete
|
2020/2021 |
Turkana Central |
Kanamkemer |